Procurement and installation of RCS/MSS system for centralized hydropower plants
EMERSON Model RX3i CPL410
System Design and Technology Selection
In the development of the Remote Control System, engineers conducted a thorough analysis of the operational requirements and selected appropriate components such as PLC, SCADA, HMIs, and Remote I/O Modules. The integration of both hardware and software was carefully engineered to support real-time monitoring and control. This approach ensures high reliability, safety, and stability of the entire system.
Systematic Planning and Team Coordination
The project involved structured planning among control engineers, software specialists, and field operation teams. SCADA and networked communication platforms were utilized to integrate data and operational processes comprehensively. Detailed workflows, risk assessments, and preliminary system testing were carried out to guarantee the effectiveness and efficiency of remote operations.
Purchasing and installation work for improving the Unit Control systemVRK-H1, H2 and H3 Vajiralongkorn Dam Power Plant
iFIX 5.9 from GE Digital
Proficy Historian from GE Digital
Site Survey and Field Testing
The engineering team conducted an on-site survey to assess environmental conditions, signal connectivity, and infrastructure constraints. The collected data was then used to model and simulate the control system prior to final deployment. Verification of command accuracy and remote execution was carried out through HMI interfaces and tablet-based control platforms, ensuring full compliance with operational requirements.