PWA PATHUMTHANI PROVINCE
- Redundant PLC RX3i Stations, 18 Remote IO Stations
- Cimplicity HMI SCADA
Water Supply
Pipeline, designed and installed in accordance with international industrial standards. The system integrates an Automatic Control System to enhance operational efficiency, reliability, and safety in real-world applications.
Implementation of the Automatic Control System
The system consists of both hardware and software components, working seamlessly together:
SCADA (Supervisory Control and Data Acquisition): Monitors real-time pipeline conditions, valve positions, and water flow rates.
PLC (Programmable Logic Controller): Executes precise control over valve operations and pressure regulation based on predefined logic.
HMI (Human Machine Interface): Provides operators with intuitive access for monitoring, control, and decision-making in a safe and efficient manner.
Remote I/O Module: Facilitates data acquisition and signal transmission between field devices and the central control room, enabling effective remote management.
Engineering Planning and Design Process
Prior to installation, the project was executed through a structured engineering workflow, including:
Planning Meetings: Defining scope, analyzing user requirements, and determining optimal system design strategies.
Site Survey: Conducting field inspections to evaluate structural conditions and installation constraints.
System Design: Developing pipeline layouts, valve positioning, and integration points for automation equipment.
Testing & Commissioning: Verifying both mechanical integrity and automation system functionality before final project handover.
Conclusion
This image represents a professional engineering approach that integrates mechanical pipeline construction with advanced automation technologies, resulting in a water supply system that is stable, safe, energy-efficient, and sustainable for long-term operation.
